Planning a home addition: what to check first
Zoning, setbacks, foundations and budget: the four things to check before drawings.
It is the first question everyone asks, so here are real numbers from the kitchens we have built since 2024.
New doors, worktops, appliances and lighting in the existing layout. Plumbing and walls stay put.
A new layout, custom cabinetry, quartz worktops and an island. This is where most of our clients land.
Structural changes, stone slabs, integrated appliances and a butler's pantry.
Cabinets are usually 35–40% of the budget. Choose them first and the rest falls into place.
Moving gas lines, removing load-bearing walls and changing window openings all add cost, but often add the most value too.
Zoning, setbacks, foundations and budget: the four things to check before drawings.
Inside our daily toolbox talks and why they cut incidents by 60%.
The pros and cons of each, and why we prefer fixed-price.
30 ready-made demos
Colour scheme
Your choice is remembered on this device.
Leave a comment