Omnira
Get a quote
Residential renovations

Love your home again

Kitchens, bathrooms, additions and whole-home renovations, designed and built by one Denver team.

4.9 from 380 homeowner reviews
Why homeowners choose us

Built different, on purpose

Eight weeks, as promised
Highland kitchen

Eight weeks, as promised

A flush steel beam and a 10-foot island.

96%

On-time handovers

Across 640 projects

Weekly photo reports

Every Friday, in your inbox.

We lived at home through a full second-storey addition and always knew what was next.

James MorganPark Hill addition

Every contract includes

  • Permits and inspections
  • Daily site clean-up
  • 10-year warranty

Fixed price

Changes quoted in writing, first.

Primary bath in four weeks
Wash Park

Primary bath in four weeks

Services

What are you planning?

A kitchen built around how you cook

A kitchen built around how you cook

Layouts, custom cabinets and stone worktops, with a temporary kitchen while we work.

  • 3D design before you commit
  • Most kitchens in 6–10 weeks
  • 5-year workmanship warranty
Bathrooms with proper waterproofing

Bathrooms with proper waterproofing

Curbless showers and heated floors on a fully flood-tested membrane.

  • 24-hour flood test
  • Heated floors
  • 10-year leak warranty
More space without moving

More space without moving

Rear extensions and second storeys that match your home, while you keep living in it.

  • Zoning feasibility study
  • Matching materials
  • Stay at home during the build
A custom home on your lot

A custom home on your lot

Architect-designed, net-zero ready homes with one fixed price.

  • Pre-construction budgeting
  • Blower-door tested
  • Solar ready
Anatomy of a renovation

Capitol Hill Victorian, week by week

  1. Week 1

    Protection and demolition

    Floors protected, dust walls up, interiors stripped to the studs.

  2. Week 3

    Structure

    Two walls removed, a steel beam installed and the floor levelled.

  3. Week 6

    Rough-ins

    New wiring, plumbing and ductwork, then city inspections.

  4. Week 10

    Drywall and joinery

    Walls closed, cabinets and trim installed.

  5. Week 16

    Handover

    Final clean, snag list and keys back to the owners.

0
Homeowner reviews
0
Average rating
0%
On time
0
Year warranty
Homeowners say

Real reviews from real projects

They told us the kitchen would take eight weeks. It took eight weeks. The crew cleaned up every single evening.

Rosa Alvarez
Rosa AlvarezHighland kitchen remodel

We lived at home through a full second-storey addition. Weekly reports meant we always knew what was next.

James Morgan
James MorganPark Hill addition

Fourteen weeks, three floors, two shifts a day and not one missed milestone. We would hire them again tomorrow.

Karen Liu
Karen LiuOperations Director, office fit-out
Questions

Before you renovate

Usually, yes. We seal work areas with dust walls and plan the noisiest weeks with you.

Always. Permit fees and inspections are included in every quote.

A 10% deposit, then staged payments against clear milestones. The final 5% is due after the snag list is complete.

Design usually starts within two weeks, and builds within six to ten weeks of signing.
Free quote

Start with a site visit

Tell us a little about your plans and we will arrange a free, no-obligation visit.

Call

+1 (555) 018-4470

Email

build@omnira-construct.com

Request a site visit

Guides

Plan your project

Omnira

30 ready-made demos

View all demos