The challenge and our approach

Vantor’s plants were running at 61% overall equipment effectiveness, well below peers, and a planned new plant would have cost $240M.

Our team spent 14 weeks on the shop floor with Vantor supervisors, introducing daily performance boards, quick-changeover methods and targeted automation. Throughput rose 23%, and the new plant was no longer needed.

Outcomes

Result achieved

+23% throughput within the first year.

Joint team

Arcwell consultants working side by side with client managers.

Pace

First measurable impact inside 12 weeks.

Sustained

Results still tracked and reported two years later.

Engagement facts

Client
Vantor Industries
Industry
Industrial manufacturing
Practice
Operations
Duration
16–40 weeks
Year
2025
Arcwell did something no adviser had done for us before: they stayed until the savings were in the accounts.